Steenslân II Stiens
The demand for new housing in Leeuwarden is high, which is why we are expanding on the Steenslân neighbourhood in Stiens with Steenslân II. The former Municipality of Leeuwarderadeel had previously drafted plans for this and set aside land. We are now taking the next step.
Housing demand in Stiens
In Stiens, the housing demand in the period to 2031 has been estimated at 170 additional dwellings. This is the outcome of a housing demand survey conducted in 2021. The demand for single-family homes in the coming years is particularly high. These include terraced houses, semi-detached houses and detached houses. There is limited demand for owner-occupied flats.
In the public rental sector, it is desirable to add more lifelong housing with a (small) garden. These are homes suitable for people with (mild) disabilities or the elderly. This supply is currently not or only barely present in Stiens and could make an important contribution to increasing the flow in the existing housing stock.
You can find more information in the report about housing demand in Stiens (opens in new tab), which was compiled by Companen, a housing market and living environment consultancy.
Expansion of Steenslân
We want to provide space in the new area for
- Homes for all
- Biodiversity
- Green space
- Recreation (footpaths, cycle route)
- Water
Ambitions of the City of Leeuwarden and Plaatselijk Belang Stiens
We want to develop an attractive place to live here:
- It will not just be a new residential area: we plan to develop an area that is attractive for all Stiens residents to live and meet each other.
- An inviting public area with green space that blends in well with the landscape around Stiens.
- There is space for all target groups in Stiens.
- Map of the Steenslân 2 area (PDF, 7.23 MB) (opens in new tab)
Urban development plan
The Steenslân II urban development plan was adopted by the municipal council on 6 December. The urban development plan (opens in new tab) presents a clear image of where housing, roads, green space and water, among other things, will be located. Before the plan was adopted, residents and organisations were given the opportunity to respond to it. Based on these responses, several aspects were amended.
The main changes between the draft plan and the definitive plan are as follows:
- There will be an additional 5 public sector rental units.
- There will be only owner-occupied houses (no rentals) along the waterfront.
- There will be a bicycle and footbridge at the Mierepaad to make the walking route accessible to disabled people.
- Lifelong homes will be built.
Participation working group
Fifteen residents of Stiens have formed a participation working group. They represent a cross-section of the population of Stiens and nearby residents.
Draft design
This ultimately led to a draft design that the working group presented to villagers. This plan was well received by many residents. It generated enthusiastic responses. All tips and comments were then further incorporated into the plans. This created a complete plan that was submitted to the city executive and the city council.
A plan was thus developed jointly by all parties. That is an approach that councillor Hein de Haan, himself present at one of the participation sessions, warmly welcomes. The working group is also enthusiastic about the approach.
Planning
The local authority is preparing the work one step at a time.
- Third quarter of 2026: We have requested permits from Wetterskip Fryslân and the Province of Friesland. These permits are necessary to dig watercourses. We are currently waiting on approval for these requests. This will most likely take around 6 months.
- May 2027: We apply a layer of sand on the soil to strengthen it. This sand will stay in place for at least 6 months. The weight of the sand will cause the soil to subside slowly. This creates a firm foundation for future road construction.
- Fourth quarter of 2027: Once the soil has been strengthened enough, we will build a temporary construction road. This will allow trucks and machines to access the area. We will also prepare the area for construction. Among other things, we will lay cables and pipes and construct a sewer system.
- Third and fourth quarter of 2027: We expect that we will be able to start selling free plots, social housing plots and plots for project-based construction.
Zoning plan and image quality plan
On 25 September 2024, the city council adopted the zoning plan and the visual quality plan. These plans detail where and how we are allowed to build and what the new neighbourhood should look like. An objection to the zoning plan was filed with the Council of State. The Council of State did not agree with the objection, making the zoning plan definitive.
Availability of plots and homes
There are not yet any building plots, houses for sale, flats for sale or public housing available. It will be announced here as soon as we know when they will become available and how you can express your interest or sign up for them.
Questions
Contact the City of Leeuwarden or send an email to steenslan@leeuwarden.nl.
Quick to:
Housing demand in Stiens
In Stiens, the housing demand in the period to 2031 has been estimated at 170 additional dwellings. This is the outcome of a housing demand survey conducted in 2021. The demand for single-family homes in the coming years is particularly high. These include terraced houses, semi-detached houses and detached houses. There is limited demand for owner-occupied flats.
In the public rental sector, it is desirable to add more lifelong housing with a (small) garden. These are homes suitable for people with (mild) disabilities or the elderly. This supply is currently not or only barely present in Stiens and could make an important contribution to increasing the flow in the existing housing stock.
You can find more information in the report about housing demand in Stiens (opens in new tab), which was compiled by Companen, a housing market and living environment consultancy.
Expansion of Steenslân
We want to provide space in the new area for
- Homes for all
- Biodiversity
- Green space
- Recreation (footpaths, cycle route)
- Water
Ambitions of the City of Leeuwarden and Plaatselijk Belang Stiens
We want to develop an attractive place to live here:
- It will not just be a new residential area: we plan to develop an area that is attractive for all Stiens residents to live and meet each other.
- An inviting public area with green space that blends in well with the landscape around Stiens.
- There is space for all target groups in Stiens.
- Map of the Steenslân 2 area (PDF, 7.23 MB) (opens in new tab)
Urban development plan
The Steenslân II urban development plan was adopted by the municipal council on 6 December. The urban development plan (opens in new tab) presents a clear image of where housing, roads, green space and water, among other things, will be located. Before the plan was adopted, residents and organisations were given the opportunity to respond to it. Based on these responses, several aspects were amended.
The main changes between the draft plan and the definitive plan are as follows:
- There will be an additional 5 public sector rental units.
- There will be only owner-occupied houses (no rentals) along the waterfront.
- There will be a bicycle and footbridge at the Mierepaad to make the walking route accessible to disabled people.
- Lifelong homes will be built.
Participation working group
Fifteen residents of Stiens have formed a participation working group. They represent a cross-section of the population of Stiens and nearby residents.
Draft design
This ultimately led to a draft design that the working group presented to villagers. This plan was well received by many residents. It generated enthusiastic responses. All tips and comments were then further incorporated into the plans. This created a complete plan that was submitted to the city executive and the city council.
A plan was thus developed jointly by all parties. That is an approach that councillor Hein de Haan, himself present at one of the participation sessions, warmly welcomes. The working group is also enthusiastic about the approach.
Planning
The local authority is preparing the work one step at a time.
- Third quarter of 2026: We have requested permits from Wetterskip Fryslân and the Province of Friesland. These permits are necessary to dig watercourses. We are currently waiting on approval for these requests. This will most likely take around 6 months.
- May 2027: We apply a layer of sand on the soil to strengthen it. This sand will stay in place for at least 6 months. The weight of the sand will cause the soil to subside slowly. This creates a firm foundation for future road construction.
- Fourth quarter of 2027: Once the soil has been strengthened enough, we will build a temporary construction road. This will allow trucks and machines to access the area. We will also prepare the area for construction. Among other things, we will lay cables and pipes and construct a sewer system.
- Third and fourth quarter of 2027: We expect that we will be able to start selling free plots, social housing plots and plots for project-based construction.
Zoning plan and image quality plan
On 25 September 2024, the city council adopted the zoning plan and the visual quality plan. These plans detail where and how we are allowed to build and what the new neighbourhood should look like. An objection to the zoning plan was filed with the Council of State. The Council of State did not agree with the objection, making the zoning plan definitive.
Availability of plots and homes
There are not yet any building plots, houses for sale, flats for sale or public housing available. It will be announced here as soon as we know when they will become available and how you can express your interest or sign up for them.
Questions
Contact the City of Leeuwarden or send an email to steenslan@leeuwarden.nl.